In one session at Canada’s Western Gateway In Motion conference in Lethbridge, a speaker talking about the global potato supply chain said Lethbridge is a long way from its customers, and that Southern Alberta product now competes against product from India and China. The line I wrote down was short: we have the quality, but we need the infrastructure.
That sentence could apply to most of the manufacturers I met in Lethbridge last week. Thank you to Rylan Howard and Cody Fluet, and to everyone at Canada’s Western Gateway and Economic Development Lethbridge, for bringing industry, government and logistics people into one room.
How the scaling is going
Alberta’s export numbers say the demand is there. Alberta’s international merchandise exports were up 2.6% year to date through May 2026, with agriculture and food manufacturing up 4.0% to $7.7 billion and industrial machinery up 22.3% to $2.1 billion [1]. Alberta also has the highest exports-to-GDP ratio of any province, which is why export capacity matters so much to the provincial economy [1]. Manufacturing continued to outpace the national average in June, rising 1.6% on the month [2].
Southern Alberta shows the same pattern close up. The event booklet puts Lethbridge region exports at $2.29 billion in 2024, with rail-served businesses generating $687 million in local economic output and the Lethbridge area holding 17.7% of Alberta’s food-manufacturing workforce [3]. The Day One session on scaling manufacturing in Alberta included Adriana Mercader (Flexahopper Plastics), Jody Young (Pratt & Whitney Canada), David Watson (Friesen Plastics), Brian Weersink (Westland RV) and Brad Beerling (Bufalus Transport and AMTA).
Where capacity is the constraint
Growth in output only counts if the product can leave. Canada’s Western Gateway says about 70% of Southern Alberta’s trade runs north to south with the United States, and Coutts-Sweetgrass is Alberta’s only 24/7 border crossing [4]. About 1,500 trucks a day run along Highway 4 from Lethbridge toward Coutts [3]. The Canada West Foundation notes that about 55% of Alberta’s non-pipeline exports move by rail, and that the capacity and efficiency of Western export corridors have not kept pace with demand [5].
The City of Lethbridge framed readiness as five questions: land, infrastructure, people, markets and investment. On markets, the slide put it plainly: connectivity matters because it moves inputs, products and people. Lethbridge County showed what a site decision looks like in numbers. Its non-residential municipal mill rate is 9.2052, against 21.5865 in the City of Lethbridge, and its offsite levy is $0, against $318,000 per hectare in the city [6]. The booklet also counts 108 businesses with rail potential near the regional freight rail network [3].
How planning can help you scale
If you run a plant, treat logistics as part of the plant design. Start with a market plan that says what is needed and where it goes. Then forecast demand far enough ahead that bottlenecks show up on paper before they show up at the dock.
Measure it. Cost to serve, on-time in full, and dwell time tell you whether capacity is keeping up with output. This only works when sales, operations and logistics share one forecast and the data behind it. Without that, the plan is a set of separate guesses.
What people have to do differently
One speaker described the shift this way: supply chain used to be supply and demand, and now it is supply, demand and geopolitics. That means moving from a reactive stance to a proactive one. Someone has to own the market plan and the forecast, and the people who ship, sell and build need to review them together on a schedule.
Communities have the same job. A county has to balance big projects across demand as it grows, and that takes the municipality, manufacturers and carriers planning in the same conversation.
Summary
Alberta manufacturers have the quality and, by the export numbers, the demand. What decides how far they scale is whether rail, road and border capacity grow with them, and whether people plan for it early. Southern Alberta is a useful place to watch because the readiness questions are being asked out loud.
If you are a manufacturer growing past your logistics, I would like to hear where product stops moving. A first conversation with me is 20 minutes: we walk through where your goods get stuck, what the constraint costs you, and what to fix first. You can book it here: https://calendly.com/corrie-lumiosc/20-minute-intro-call
References
[1] Rob Roach, ATB Financial, “Alberta’s exports through May 2026,” The Twenty-Four, 13 July 2026. https://www.atb.com/company/insights/the-twenty-four/alberta-exports-update-july-13-2026/
[2] Marcus & Millichap, “Research Brief: August, Canada Industrial,” August 2026. https://www.marcusmillichap.com/research/research-brief/2026/08/research-brief-august-canada-industrial
[3] Economic Development Lethbridge, In Motion event booklet, Oct 29 to 30, 2026.
[4] Brady Schnell, interviewed in Inside Logistics, “Canada’s Western Gateway helps connect Southern Alberta businesses to the world,” 16 March 2026. https://www.insidelogistics.ca/features/canadas-western-gateway-helps-connect-southern-alberta-businesses-to-the-world/
[5] Gary Mar, Canada West Foundation, “By rail, road and sea, Western export infrastructure needs a refresh,” The Hill Times, 21 July 2025. https://cwf.ca/research/publications/op-ed-by-rail-road-and-sea-western-export-infrastructure-needs-a-refresh/
[6] Lethbridge County and City of Lethbridge presentations, In Motion, Oct 29, 2026 (event slides).


Leave a Reply